Thursday 11 December 2008

Latest progress

Once again, blogfans, I am practically buried under a deluge of stroppy emails from frustrated viewers demanding an update. Highly remiss of me to have kept you all waiting so long.


All the water and heating pipes have been run, and will be
hidden behind skirting and insulation board.


The lobby/dressing room area won't have the full-height sloping ceilings so the
stud wall has been insulated against the cold void which will be behind it.


The dressing room area will be lit during daylight by a sun pipe. That's a highly reflective pipe that links the ceiling with a hole in the roof covered with perspex to let in daylight.


Things are starting to look nice and tidy around the skylights. The ceilings have foam board insulation between the rafters, and are further covered in insulated plasterboard.


The outside walls are covered in that too.


The corner round the hot water tank will be neatly boxed in and the sink will go next to it.


Spot of bother looming for the portholes: I had some bendy board to line the holes with but it was just too short. Need to find another method, so any sensible suggestions are welcome. In fact it's so long since I had a meaningful number of comments on a post, I'll happily accept stupid ones too.