Some finishing: Lacquering the skirting and door frames, bung a bit of architrave up around the Love Shack hatch, all washed down with a great big clear out ready for some furniture. This is the tidiest it will ever look.
Monday, 21 July 2008
Clear out
Some finishing: Lacquering the skirting and door frames, bung a bit of architrave up around the Love Shack hatch, all washed down with a great big clear out ready for some furniture. This is the tidiest it will ever look.
Sunday, 20 July 2008
Say goodbye to unsightly pipes in 3 easy stages
The pipes for the underfloor heating stuck out of the floor in the corner of the room. The heating boiler is just the other side of the wall, so that's where we'll put the manifold to connect to the boiler.
Saturday, 19 July 2008
Hurdles
Friday, 18 July 2008
Details
Thursday, 17 July 2008
Jammin' again
Neat and tidy
The detailing is starting to come together. I am pleased with the join between the tiled bathroom floor and the bamboo, looks lovely. If I do say so myself.
Labels:
Downstairs Shower Room,
floor,
Studio
Wednesday, 16 July 2008
Wood is good
Lots of fiddly bits were done today, all the bamboo boards that needed cutting and planing to fit in those awkward little places, but add nothing to what you've already seen. I did pop off to Wellingon Timber where I bought lots of skirting, architrave and various other bits of timber which will soon be fitted around the place making it look awfully smart.
Tuesday, 15 July 2008
More floor
Sunday, 13 July 2008
Coming on...
Didn't get as much done today as I'd hoped because I was interrupted by the annual Culmstock Duck Race which happened today. Unfortunately, my duck was lame.
Saturday, 12 July 2008
Laying the floor
The first few bits are stuck together with glue. It will be a floating floor, which means its not attached to anything. Just a big slab of stuck-together boards.
Arne helped me before he went off to water polo. This floor will be so beautiful you just want to snog it. By the way, did I mention it is made of bamboo? Apart from the long distance transport, it is very eco-friendly as the bamboo only takes a few years to grow. Mighty sustainable. Hope there are no pandas around here who will want to take a bite out of it.
Friday, 11 July 2008
Thursday, 10 July 2008
Slurry applied, worry denied!
Hello Blogfans! I must confess, I was worried. I'd bought seven bags of very expensive latex floor leveling compound to lay on the rough concrete to make it worthy of the beautiful bamboo floor which should arrive on Friday. I read the instructions, scratched my chin, read them again. Worry gave way to fear. All sorts of stuff about smoothing with a trowel, doing things IMMEDIATELY, maximum 20 minutes working time at 10 degrees... Zoiks, scraping up £16 worth of compound and binning it due to incompetence with a trowel or slowness with the mixing bucket, not a comfortable thought. Phone Richard! That's what to do. Some time later, I felt much more confident, and yesterday morning, Rich came over for a cup of coffee and to further brief me on the behavior of the grey gloop. So after lunch, I was ready to go.
Tools ready too. A mixing bucket, a drill with a mixing bit, a
spare fully charged battery on stand-by.
There's never anyone around to take pictures of me when I'm in action, all glistening with perspiration, bulging muscles, but this is the best I could do myself. The adrenalin and afore mentioned perspiration were pumping at this point. The temperature was more like 20 degrees and working time was about 10 minutes. As soon as one lot was spread out with the trowel, i was back mixing the next at top speed. I'd watched Richard mixing plaster and copied his technique: Bag of powder between the knees, drill in one hand mixing the slop and rapid pelvic thrusts shaking the powder from the 25KG bag into the bucket. That'll get anyone sweating.
Tools ready too. A mixing bucket, a drill with a mixing bit, aspare fully charged battery on stand-by.
There's never anyone around to take pictures of me when I'm in action, all glistening with perspiration, bulging muscles, but this is the best I could do myself. The adrenalin and afore mentioned perspiration were pumping at this point. The temperature was more like 20 degrees and working time was about 10 minutes. As soon as one lot was spread out with the trowel, i was back mixing the next at top speed. I'd watched Richard mixing plaster and copied his technique: Bag of powder between the knees, drill in one hand mixing the slop and rapid pelvic thrusts shaking the powder from the 25KG bag into the bucket. That'll get anyone sweating.Tuesday, 8 July 2008
Cor! A floor!
A thousand apologies for being so intermittent lately. Too bally much to do around here. Presently we are working towards putting the new floor down, which should arrive next week.
First, a jolly good clear out. Then a seemingly endless round of damping down with water to supress the dust, and sweeping. Finally, I even hoovered the concrete.
Then, the condrete floor is sealed with PVA sealant prior to applying some fancy latex leveling compound. The first section is done. More soon!
First, a jolly good clear out. Then a seemingly endless round of damping down with water to supress the dust, and sweeping. Finally, I even hoovered the concrete.
Then, the condrete floor is sealed with PVA sealant prior to applying some fancy latex leveling compound. The first section is done. More soon!
Thursday, 3 July 2008
If you enjoy my blog.....
...you'll love the all new "Richard's Camper" blog which you'll find in the links section on the left of this page. Regular visitors here will already feel they know Richard well, the lovable rogue, so please tune into his blog and tell him what you think of him.
As for me, been very busy getting not much done. Poor Janine has been unwell and its Arne's birthday tomorrow. I have ordered the flooring for the main part of the studio and will set about scraping, cleaning and leveling the concrete in preparation soon. So keep checking in, there's action on the horizon!
As for me, been very busy getting not much done. Poor Janine has been unwell and its Arne's birthday tomorrow. I have ordered the flooring for the main part of the studio and will set about scraping, cleaning and leveling the concrete in preparation soon. So keep checking in, there's action on the horizon!
Saturday, 28 June 2008
Wednesday, 25 June 2008
Painting
The reason for the big clear out on Monday? So we could all paint like crazy on Tuesday!
Niels did the ceilings because he is the tallest, and also the only one apart from Sal who doesn't have some physical ceiling painting impairment.
Labels:
Arne,
Love Shack,
Painting,
Studio
Monday, 23 June 2008
He ain't heavy...
...he's a poo-head, is what I might have said about my younger brother Niels in my younger days for a laugh, but when your brother comes hundreds of miles to see you with his lovely partner and you rope him into helping you clean out three tons of dust and crap from a building site, that's hardly polite, not to mention ungrateful.
Here he is. He's in a brilliant band called Birdafraider based up north near Hull.
http://www.birdafraider.co.uk/
Here he is. He's in a brilliant band called Birdafraider based up north near Hull.http://www.birdafraider.co.uk/
Thursday, 19 June 2008
Subscribe to:
Posts (Atom)





























